Tomah VA Boiler Plant

Projects

Tomah VA Boiler Plant

A major boiler plant replacement executed without downtime.

Federal / Healthcare Tomah, WI Boiler PlantSteamTemporary BoilersSCADA

Case Study

This VA project required a complete high-pressure steam plant replacement while preserving service to the campus.

Roberts coordinated temporary boilers, new watertube boilers, feedwater systems, SCADA controls, and demolition logistics.

Challenge

The campus required a major high-pressure steam plant replacement while maintaining service and coordinating temporary boiler capacity during turnover.

Scope

  • Two temporary mobile boiler rooms
  • Three 900-HP watertube boilers
  • SCADA controls and gas detection
  • Robotic demolition of old boilers

Execution

Roberts coordinated two temporary mobile boiler rooms, three 900-HP watertube boilers, feedwater systems, SCADA controls, gas detection, and robotic demolition logistics.

Result

The project is a strong example of complex boiler-plant replacement with temporary systems, controls, demolition, and steam continuity planned as one sequence.

Technical Highlights

  • Two temporary mobile boiler rooms
  • Three 900-HP watertube boilers
  • SCADA controls and gas detection
  • Robotic demolition of old boilers
Have a similar project? Request an Estimate

Back to projects

Construction

Have a bid, retrofit, or complex mechanical scope?

Request Estimate

Careers

Ready to help build the next chapter of Roberts?

View Careers