Jesse Brown VA Blood Lab
Complex blood lab renovation in downtown Chicago with phased work and blind crane picks.
HealthcarePipingControlsRooftop Equipment
- Multiple blind crane picks for roof-mounted air handlers
- Steam and hot water piping while existing lab remained operational
- Open protocol controls and 8-story exterior duct risers
